I-2 and I-69C Interchange

REL is currently serving as the Independent Quality Firm (IQF) providing testing and inspection serviced for this $303M project.

The Project

The I-2/I-69C Interchange is undergoing full reconstruction in what will be considered one of the largest investments in the area.

The 7.8 mile project improvements include:

  • Full reconstruction of the I-2/I-69C Interchange to include two-lane direct connectors in all four directions
  • Reconstruction and/or widening of the I-2 general purpose lanes from six to eight lanes (four in each direction)
  • Operational improvements including the reconfiguration of main lane ramps on I-2 from 2nd Street to FM 2557 (S. Steward Rd) and improvements to the approaches and departures to and from the direct connectors

Our Work

REL is currently the Independent Quality Firm (IQF) providing construction materials testing and inspection for the project.